For nearly three decades, DCS has played a vital role in some of the most impactful and challenging roadway and infrastructure projects in Arizona. We specialize in projects with heavy resource requirements, demanding schedules and budgets, and multiple technical capabilities. With our highly-trained management team, experienced field crews, and readily-available equipment fleet, DCS is prepared for any project.
DCS pursues projects with public and private owners
through the following delivery methods:
Construction Manager at Risk
Design-Bid-Build
Design-Build
Job Order Contract
Greenway Road Improvements
This project consisted of widening 1.5 miles of roadway and intersection improvements to 4 travel lanes, raised median,…
Read MoreMeridian Road, Germann Road to State Route 24, Roadway & Drainage Improvements
This project consisted of 1.5 miles of new arterial roadway improvements including more than 4 miles of sewer,…
Read MoreMeridian Road, Combs Road to Cherrywood Drive
This project consisted of 1 mile of roadway improvements of Meridian Road from Combs Road to Cherrywood Drive.…
Read MoreVerrado East District Phase 4
DCS was contracted as the general contractor to provide a turnkey approach for this 337-lot residential subdivision in…
Read MoreWaddell Road Improvements
This high-profile section of Waddell Road, from the SR303 to Reems Road, was a 2-miles multi-phased reconstruction project.…
Read MorePrasada Infrastructure Improvements
This project included the new construction of Prasada Parkway, Alexandria Boulevard, and Sarival Avenue, which totaled over 1…
Read MoreFairway Drive Road Improvements
This roadway improvements project consisted of realigning and widening Fairway Drive from I-10 traffic interchange to Van Buren.…
Read MoreOld Price Road Improvements
This project included the construction of roadway and drainage improvements to approximately .75 miles of Old Price Road…
Read MoreNovus Innovation Corridor
The Novus Innovation Corridor is a mixed-use development project that consists of approximately 8 million square feet of…
Read MoreSweetwater Avenue: Sarival Avenue to Loop 303
This project consisted of .5 mile of roadway improvements including two new lanes in each direction with a…
Read MoreAlamar Phase 2 and 4 Improvements
This multi-phased project included the realignment of El Mirage Road connecting into Broadway Road for a new community…
Read MoreThe Lakes at Rancho El Dorado
DCS was contracted for multiple phases of this 833-lot mastered planned community located in Maricopa, Arizona. This project…
Read More