Bulldozer Wash Drainage Improvements

PROJECT OVERVIEW

  • DMB Associates
  • Year : 2010 – 2011
  • $1.3 Million
  • Project Overview: This project consisted of grading three miles of Bulldozer Wash at the master-planned community of Verrado in Buckeye. Work included mass excavation, concrete spillways, concrete weir structure, box culvert, grouted riprap, and storm water infiltration galleries. DCS installed 7,000 SF of a concrete drainage weir structure along with more than 12,400 tons of riprap to improve drainage and prevent erosion.

Queen Creek Road Improvements – Val Vista to East Maricopa Floodway

PROJECT OVERVIEW

  • Year: 2010-2011
  • $4.2 Million
  • Project Overview: This project consisted of widening 1.75 miles of Queen Creek Road. Work included removals, grading, paving, water, sewer, storm drain, slurry seal, cement-treated base, irrigation, SRP, street lights, traffic signals, landscaping, and concrete. This project included installing 7,700 LF of 15” through 36” rubber-gasketed, reinforced concrete pipe along with more than 10,000 LF of curb and gutter.