Frye Road Improvements

PROJECT OVERVIEW

Frye Road Improvements

City of Chandler

August 2017 – March 2018

$1.1 Million

Project Overview:  This .5 mile roadway improvement project extended Frye Road from Roosevelt Avenue to Kyrene Road. Scope of work included a single barrel box culvert at the SRP Gila Drain which required the design and installation of a bypass system to construct the box culvert without dry-up conditions.  Key details included asphalt paving, concrete curb and gutter, sidewalk, storm drain facilities, street lights and landscape improvements and realignment of the Gila Drain.