Bulldozer Wash Drainage Improvements

PROJECT OVERVIEW

  • DMB Associates
  • Year : 2010 – 2011
  • $1.3 Million
  • Project Overview: This project consisted of grading three miles of Bulldozer Wash at the master-planned community of Verrado in Buckeye. Work included mass excavation, concrete spillways, concrete weir structure, box culvert, grouted riprap, and storm water infiltration galleries. DCS installed 7,000 SF of a concrete drainage weir structure along with more than 12,400 tons of riprap to improve drainage and prevent erosion.