Enclave at North Shore – Concrete & Paving

PROJECT OVERVIEW

  • Mattamy Homes
  • April 2016 – Ongoing
  • $508,337
  • Project Overview: This project consists of completing all concrete and paving along with signage, striping, adjustments, and traffic control work for both onsite and offsite improvements of the project, which ties into Elliot Road and McQueen Road. This project includes more than 7,002 LF of curb and gutter along with more than 11,949 SY of asphalt pavement.

Riggs Road

PROJECT OVERVIEW

  • Town of Queen Creek
  • Queen Creek, Arizona
  • May 2018 – June 2019
  • $10,600,000
  • Project Overview: This multiphased project consisted of improvements of Riggs Rd. from Crismon Rd. to Meridian Rd as well as the reconfiguration of the Rittenhouse Rd/Gary Rd/Riggs Rd Intersection at the union Pacific Railroad. Key scope items include 24″ and 36″ Jack and Bore under UPRR, 3 miles of Asphalt Paving, 90,000+ SY of lime treated subbase, 4 miles of utility installation including water, sewer, storm drain/irrigation, landscape, street lights and traffic signals.

Frye Road Improvements

PROJECT OVERVIEW

Frye Road Improvements

City of Chandler

August 2017 – March 2018

$1.1 Million

Project Overview:  This .5 mile roadway improvement project extended Frye Road from Roosevelt Avenue to Kyrene Road. Scope of work included a single barrel box culvert at the SRP Gila Drain which required the design and installation of a bypass system to construct the box culvert without dry-up conditions.  Key details included asphalt paving, concrete curb and gutter, sidewalk, storm drain facilities, street lights and landscape improvements and realignment of the Gila Drain.

Aloravita

PROJECT OVERVIEW

Aloravita Blvd Infrastructure Improvements & Jomax Road Widening

City of Peoria

May 2017 – September 2017

$3.3 Million

Project Overview:  This roadway and utility improvement project included a half mile widening of Jomax Road from a single lane of travel each direction to two lanes each direction with a flush median as well as the civil infrastructure for Aloravita, a 263 lot master planned community in Peoria . Scope of work included new sewer, water, dry utilities, asphalt paving, concrete curb and gutter, sidewalk, ADA ramps, storm drain, street lights and landscape improvements.

Eastmark – Roadway Improvements

PROJECT OVERVIEW

Eastmark – Phase VIII Roadway Improvements    

DMB Mesa Proving Grounds LLC

August 2017 – July 2018

$6 Million

Project Overview:  This project consisted of 3 newly constructed roadways, Copernicus, Point Twenty-Two Boulevard and Inspirian Parkway totaling one mile in total length.  Scope of work included a concrete arch culvert pedestrian underpass, asphalt paving, concrete curb and gutter, sidewalk, storm drain facilities, street lights, landscape improvements and traffic signals.

Higley and Baseline Intersection Improvements

PROJECT OVERVIEW

  • Year: 2012 – 2013
  • $2.6 Million
  • Project Overview: This project consisted of widening 1.5 miles of Higley and Baseline Roads. Work included removals, grading, paving 20,857 SY, concrete curb and gutter, water, 4,883 LF of 15” sewer, storm drain, microseal, 1,470 LF of 36” Roosevelt Water Conservation District (RWCD) irrigation and structures, SRP, street lights, traffic signal relocation, and landscaping.

Enclave at North Shore – Concrete & Paving

PROJECT OVERVIEW

  • Mattamy Homes
  • April 2016 – Ongoing
  • $508,337
  • Project Overview: This project consists of completing all concrete and paving along with signage, striping, adjustments, and traffic control work for both onsite and offsite improvements of the project, which ties into Elliot Road and McQueen Road. This project includes more than 7,002 LF of curb and gutter along with more than 11,949 SY of asphalt pavement.

Cove at Palm Valley

PROJECT OVERVIEW

  • Mattamy Homes
  • March 2016 – Ongoing
  • $503,390
  • Project Overview: On this small community project, Mattamy was able to contract DCS in a turnkey approach to self-perform the grading, wet utilities, concrete, and paving. This project also includes the removal of an existing underground culvert and replacing it with an upsized culvert to help control flooding of the existing roadway during heavy storms.

Sonoran Foothills 10

PROJECT OVERVIEW

  • Shea Homes
  • March 2016 – Ongoing
  • $571,780
  • Project Overview: This project is a 111-lot subdivision located in the foothills of the Sonoran Desert Preserve. DCS self-performed the concrete and paving for this project, which included more than 5,910 LF of curb and gutter and more than 7,817 SY of asphalt pavement. We also removed and replaced sidewalk ramps along North Valley Parkway and Sonoran Desert Drive to comply with new ADA and county specifications.

Caballo Crossing

PROJECT OVERVIEW

  • Mattamy Homes
  • January 2015 – May 2015
  • $1.8 Million
  • Project Overview: The project was a 137-lot community, which included improvements to Buckeye Road and the construction of 103rd Avenue to accommodate the new subdivision. DCS performed all trades for this project including grading, sewer, water, storm drain, Salt River Project (SRP) irrigation, concrete, and paving. The subdivision is located on a 40-acre site in which DCS excavated 71,000 CY of dirt to complete the grading along with 2,605 LF of SRP irrigation pipe, 4,417 LF of vitrified clay pipe (VCP), and ductile iron pipe (DIP) sewer main.