Project Overview
  • Otago Development, Inc.
  • June 2017 – January 2018
  • $1,215,304.70
  • Project Overview: DCS was the general contractor for this arterial roadway construction project at SR24 on Ellsworth Road. DCS self-performed 73% of the work and handled extensive project phasing and large traffic volumes while staying on schedule and within budget. DCS communicated with ADOT and the City of Mesa while they performed the right-of-way work on Ellsworth Road. The scope of work included utility replacements, wet utility installation ranging from 8” to 30”, traffic signals, 6,000 SY of rubberized asphalt pavement, ADOT Portland Cement Concrete Pavement (PCCP) and street lights.