Basha Road, Parkview Place CMAR

Chandler, AZ

Filter Projects:

 

Current Projects

Select Year

Project Overview
  • Ashton Woods
  • October 2016 – December 2016
  • $856,846.00
  • Project Overview: This multi-phased CMAR project consisted of installing 0.25 miles of 8” sewer line down the 2-lane Basha Rd at Ocotillo Rd adjacent to Snedigar Sports Complex. DCS self-peformed 86% of the work. Specific work included existing sewer line removal, existing waterline relocations, sewer line installation, permanent asphalt replacement and complete restoration to return Basha Rd to its’ existing conditions. Public safety was a major concern because of projects location to Snedigar Sport Complex and large volume of vehicle and pedestrian traffic. The project was built in multiple phases working around the schedule constraints of the sport complex to limit the exposure to the public during construction.